Container Stacking
J & W Transfer stacked shipping containers for a client that will convert them into modern internal offices with decks.
J & W Transfer stacked shipping containers for a client that will convert them into modern internal offices with decks.
J & W Transfer stores tanks for a Wisconsin tank company. This picture shows some brewing/fermenting tanks loaded out of storage and ready for transport.
J & W Transfer unloaded and placed a 60,000 lb. wood chipper.
J & W Transfer sets tanks in place and stands them upright. The weight of each tank was 12,000 lbs.
J & W Transfer recently worked for Chemtool to unload, move, rig in and stand up chemical tanks at their Rockton facility. Each tank was 50′ tall, 13′ 6″ in diameter and weighed 21,000 lbs. J & W Transfer unloaded the tanks from the truck, moved the tanks into the facility and stood them up…
Client: North American Mechanical homepage: www.naminc.com/ Location: Prairie du Sac, WI Job Description: “J & W Transfer assisted North American Mechanical in the assembly of air handling units for the surgical unit at the new Sauk Prairie Memorial Hospital and Clinics. J & W Transfer used our gantry system to rig the units into place and stabilize the…
Client: Chemtool Inc.
homepage: chemtool.com
Location: Rockton, Illinois
Job Description:
J & W Transfer moved a 72,000 lb. sugar tank within Chemtool’s Rockton, Illinois facility using our 60/80 versa lift.
Client: SSI Technologies homepage: ssitechnologies.com Location: Janesville, WI. Job Description: J & W Transfer unloaded a 550 ton punch press and set it in place in a pit within the plant. The punch press actually weighed 106,000 lbs. J & W Transfer completed the project by squaring off the punch press in…
Client: Goex Corp homepage: goex.com Location: Janesville, WI Job Description: J & W Transfer relocated the plastic extrusion lines from a company in Ohio to the Janesville, Wisconsin plant. The relocation included 20 truckloads of equipment. J & W Transfer’s responsibilities included, but were not limited to, moving 36000 lb. extruders, dismantling small conveyors and an 8…
Client: SSI Technologies, Inc. homepage: ssitechnologies.com Location: Janesville, WI Job Description: At SSI-Sintered Division we removed the crown from a 550 ton press. The crown weighed 45,000 pounds. We then pulled the connecting rods out. When all the repairs were completed to the machine, we reassembled the rods and set the crown back into place. The equipment we…
Client: Data Dimensions homepage: datadimensions.com Location: Janesville, WI Job Description: We moved an air conditioning unit for the computer room on the 2nd floor of their Janesville facility. The piece was too large to fit in the elevator. We brought a 5,000 pound lift truck in and lifted the unit up over the handrail. We then…
Client: United Alloy, Inc. homepage: unitedalloy.com Location: Janesville, WI Job Description: At United Alloy we picked up a 90,000 pound generator that was to be shipped to North Carolina. We used 3 cranes altogether (one 70 ton, one 80 ton and one 50 ton). The generator had to be lifted equally at 12 pick points and…
Client: Alcoa Location: Beloit, WI Job Description: At Alcoa we disassembled a production line that made service wheels. We then skidded and crated all the parts and loaded them in an oversea container for shipping to Germany. The heaviest part weighed 75,000 pounds. The equipment we used was our 40/60 Versa lift, 30,000 pound lift…
Client: Dane Manufacturing homepage: danemfg.com Location: Dane, WI Job Description: We received a laser at our warehouse in 4 separate containers and 1 large crate from Italy. We stored the laser in our warehouse for approximately 3 months. At that time we reloaded the machine and delivered it to Dane Manufacturing. We assisted the installers in setting…
Client: R & M Machine homepage: rmmachine.com Location: Milton, WI Job Description: We moved the machining division of Gilman Engineering in Janesville to R & M Machine’s facility in Milton. There were 3 large boring bars and 10 to 15 CNC machining centers (weighing from 10,000 pounds to 40,000 pounds). We used our 40/60 Versa lift…
Client: Latitude Corp.
homepage: latitudecorp.com
Location: Verona, WI
Job Description:
We relocated Latitude Corporation to their new 130,000 sq. ft. building within Verona. We moved machines weighing between 2,000 pounds and 57,000 pounds.
Client: Roosevelt Elementary School homepage: janesville.k12.wi.us/roo Location: Janesville, WI Job Description: At Roosevelt School we removed and installed the boiler system. We then removed 16′ of the chimney and the chimney cap. The cap was removed in one piece and weighed 8,000 pounds. The equipment we used was our 50 ton crane and an 8,000 pound lift…
Client: Olsun Electric
homepage: olsun.com
Location: Richmond, IL
Job Description:
We have moved several transformers for Olsun Electric. The transformers weigh between 10,000 pounds and 50,000 pounds.